I think LHR should do away it. All it does is confirm what it should all ready know. If an operator can figure out how to "build" a project with the software, surely they are capable of using a tape measure to tell the machine the correct starting size of the project. If the machine can find the top, left hand corner of the board it should be good to go. This could be easily accomplished by manually jogging the end of the board to a reference point, and then telling the machine "you're good to go." What am I missing here??