gsrice
05-07-2008, 08:59 PM
Hi all --
Here's something a little different
One field / table was done in cherry - 28 * 62
The second all done with used oak wood flooring -- tiled then assembled -- the scrap, scrap including old nails etc, make up the trim -- base I had to but the oak -- ran about $70 --
carve time around 60 hours each
Here's something a little different
One field / table was done in cherry - 28 * 62
The second all done with used oak wood flooring -- tiled then assembled -- the scrap, scrap including old nails etc, make up the trim -- base I had to but the oak -- ran about $70 --
carve time around 60 hours each