This is an on going project for a B B Que pit manufacture in the area.
We have an agreement, I make them upon his request about twice a year.
All I have to do is stain them and the are ready.
The sled in the back makes 6 at a time backside is drilled and the front is carved and
outlined for me to finish up on the table saw. the slots on the edges is done on a jig on the table saw too
Total time on the CW is 57 min. both sides.